My WebLink
|
Help
|
About
|
Sign Out
Airmont Meadows Subdivision - Hydrostudy - SKV-14
>
Hydro Studies
>
Airmont Meadows Subdivision
>
Airmont Meadows Subdivision - Hydrostudy - SKV-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2009 2:42:09 PM
Creation date
3/18/2009 2:42:08 PM
Metadata
Fields
Template:
HD-HydroStudies
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1~,~ ~~~~ <br />DEC 0 2 206 v~ ! vv <br /> County O~'Loudoun <br /> Division ofEnvtronmental Health <br /> Leesburg, Virginia 20177 <br /> Office (703) 777-0234 Faz (703) 771-5023 <br /> Inspection Request (703) 771-5808 <br /> WELL/WATER Permit # 750258260007 <br />Owner Name: <br />Owner Name2: DOUGHERTY, GAIL G ET ALS TRUST Permit Active Date: <br />% SCHNADER <br />HARRISON <br />SEGAL & LE 2005-11-22 <br /> <br />Owner Address: , <br />, <br />Pin #: <br />1600 MARKET ST STE 3600 614469655000 <br /> Tax Map #: <br />PHILADELPHIA PA19103 /42/~~~~~~~93~ <br /> <br />Applicant Name: Construction Purpose: <br />DOUGHERTY, GAIL G ET ALS TRUST NEW CONSTRUCTION <br /> <br />Applicant Narne2: Permit Pu <br />GO EMERY & GARRETT ~' <br />WATER FTW <br />Applicant Address: P.O. BOX 1578 Structure Type: STRUCTURE TYPE <br /> MEREDITH NH 03253 System Type : IIIB <br />Home Phone: Work Phone: Ext <br />Subdivision: L <br />Pepe 1 of 5 <br />ot. <br />Directions to property : Rt 7 W to Rt 719 S then turn left onto Snickersville Turnpike <br />property is about 0.8 miles on the left <br />New X Repair _ Abandonment _ Upgrade _ Hydrofrack _ Well ID # SKy - t'-E <br />Based on the application for swell/water supply system constructi <br />i <br />f <br />on perm <br />t <br />iled in accordance with Chapter 1040. Codified <br />Ordinances, a construction permit is issued to: DOUGHERTY, GAIL G ET ALS TRUST <br />DESIGN NOTE: INSPECTION RESULTS <br />Water supply, existing: (describe) Water supply location: Satisfacto <br />^ <br />^ <br /> ry yes <br />no <br />To be installed: class IIIB Drillers Report (G.W.2) Received yes ^ no ^ <br />Cased and Grouted to Bedrock plus 10' or a minimum Well Construction Approval yes ^ no ^ <br />cased 70 'Grouted 70 'whichever is greater Sanitarian Date <br />Well Location. See Page Z Y Well Driller Lic # <br />I. If well yield as determined by 30 minute airlift test is les Pump Installer Lic # <br />s <br />than 5 gallons per minute, a pumping test must be pertormed Chemical Quality Data Received yes ^ no ^ N/A ^ <br />as follows: Pumping Data Received yes ^ no ^ N/A ^ <br /> A <br />b <br />ilt <br />k <br /> <br />A. Pump and related equipment shall be installed and the static s <br />u <br />s <br />etch on page <br />Bacteriological Sample Received yes ^ no ^ <br />water level measured. <br />B. Pumping shall begin at a rate of withdrawal realer than 5 <br />9 Water System Approved es ^ no ^ <br />y <br /> <br />GPM until water level dr <br />t Sanitarian Date <br />ops <br />o a point close to bottom of the <br />well. II. Criteria for approval of well and well yield are as follows: <br />C. At this point, the pump rate shall be adjusted so the water The well must produce a: <br />level remains constant. <br />D. Measure and record the volume of water discharge and A. Minimum of 1 gallon per minute for 6 continuous <br /> <br />water level (electric tape) at 15 minute intervals throughout pumping hours after the well has been pumped out <br /> <br />the test. according to Part 1, Sec. B of this permit. <br /> <br />E. Discharge water at least 50 feet from the well and sewage B. The pump test can be terminated early and well yield <br />id <br /> <br />disposal area. cons <br />ered adequate if: <br /> <br />F. InterruptiorS of pumping longer than 15 minutes shall require 1. The well cannot be pumped out as stated in Part 1, <br /> <br />extending the pumping time that amount of time Sec. B of this permit. <br />. 2. The well yields 2.5 GPM or greater for 3 hours of <br /> <br /> <br />The well/water system is to be constructed as specified by the continuous pumping after Part 1, Sec.6 of this <br /> <br />permit X and attached plans/specifications permit are completed. <br />. _ C. Sufficient stora a and <br />g yield may be considered for <br /> approval. <br />This water system construction permit is null and void if (a) D• Person conducting the pump test shall collect a sample <br />conditions are changed from those shown on the application <br />(b) conditions are changed from th <br />h to be analyzed for constituents described in Codified <br />ose s <br />own on the <br />comstruction permit. Ordinances of Loudoun Coun Title 4, Cha ter 1040, <br />ty p <br /> Appendix III. <br /> E. Replacement wells are exempt from this requirement. <br />.-7 n <br />Date: 20 5-11-22 Issued By: ~.- ~ ~' This Construction <br />Date: ~ Z~ ~~ Reviewed By: ) .rt L Permit Valid Until <br /> 2006-11-22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.