Laserfiche WebLink
20. <br />15. <br />c <br />10. <br />U <br />(U <br />Q <br />U <br />0 <br />5. <br />0 <br />I I I--T <br />T <br />I <br />r <br />❑ <br />i <br />4-1 <br />❑ <br />❑ <br />❑ <br />c <br />0. 200. 400. 600. 800. 1000. <br />Time (min) <br />WELL TEST ANALYSIS <br />Data Set: P:\Loudoun 2005\Mountain Road - Demmitt Job\Peak Lot 1.agt <br />Date: 04/15/08 Time: 18:57:21 <br />PROJECT INFORMATION <br />Company: GeoTrans, Inc. <br />Client: Peak Investments LLC <br />Project: 5961.001.01 <br />Location: 14280 Mountain Road <br />Test Well: Lot 1 (2.0 GPM) <br />Test Date: 3/7/2008 <br />WELL DATA <br />Pumping Wells Observation Wells <br />Well Name <br />X ft <br />Yft <br />Well Name <br />x (ft) <br />Y ft <br />Lott <br />2226694 <br />567539 <br />Lot1 <br />2226694 <br />567539 <br />Lot10 <br />2226209 <br />567399 <br />SOLUTION <br />Aquifer Model: Leaky Solution Method: Hantush-Jacob <br />T = 39.26 ft2/day S = 1.2E-5 <br />1 /B = 0.0006656 ft-1 Kz/Kr = 1. <br />b = 500. ft <br />