Laserfiche WebLink
<br /> <br /> <br /> <br />2/8/2023 <br /> <br />Keith and Melissa Eck <br />11 Oak St. <br />Sterling, VA 20165 <br /> <br />Subject: Sewage Treatment System Construction Permit <br />PIN: 012-45-0856 <br />Permit: T30492880001 <br /> <br />The permit to construct an onsite sewage treatment system includes this approval letter and the approved plans prepared by <br />Pamela M. Pruett., consisting of (7 pages), and dated 1/31/2023, which are attached. The application for a permit was submitted <br />pursuant to 32.1‐163.5 of the Code of Virginia which requires the Health Department to accept private soil evaluations and designs <br />from a DPOR licensed onsite soil evaluator (OSE) or a professional engineer (PE) working in consultation with an OSE. The <br />permitted system is certified as complying with the Board of Health’s regulations by: Pamela M. Pruett OSE / PE # 1940001034 <br />Phone # 540-272-2892. This permit is issued in reliance upon that certification. This permit is null and void if conditions are changed <br />from those shown on the application, or the approved plans referenced above. <br /> <br />System Type: Conventional <br /> <br />This permit is being issued for the abandonment of the septic system labeled PSSD-1954-0010. 0 bedrooms. 0 GPD. <br /> <br />*If this permit is issued for an Alternative system, then it is the owner’s responsibility to follow the operation and maintenance <br />manual and abide by the requirements in 12VAC5‐613‐140, and Chapter 1067.04 of the Loudoun County Codified Ordinance. <br /> <br />The Loudoun County Health Department must inspect and approve the system prior to backfill or covering the system. Installation <br />inspection requests are to be made by the appropriately licensed sewage system installer; inspection requests should be made at <br />least 24 hours in advance. In addition to the Health Department inspection, the certifying licensed professional must inspect the <br />system and submit the appropriate documentation to the Health Department. <br /> <br />Prior to system use, all required inspections, documentation, and approvals must be completed and submitted to the Health <br />Department; if applicable, the Department will issue an operation permit upon satisfactory completion of all regulatory requirements. <br />This construction permit is transferrable until expired or deemed null and void (A permit transfer form may be obtained from the <br />Virginia Department of Health website for Water and Wastewater Services). <br /> <br />To ensure compliance with all applicable local, state, and/or federal regulations, it is recommended that the Loudoun County <br />Department of Building and Development and the Department of Planning and Zoning be contacted prior to acting on this permit. <br />Building and Development may be contacted at 703-777-0220 or bad@loudoun.gov, and Planning and Zoning may be contacted <br />at 703-777-0246 or dpz@loudoun.gov. <br /> <br />This permit to construct a sewage treatment system expires: 8/8/2023. <br /> <br /> <br /> <br />Signature: __________________________________________ Print Name: ______Mark Sharrer (EHS)_____ <br /> <br /> <br /> <br /> <br />