Laserfiche WebLink
County Of Loudoun <br />Division of Environmental Health <br />Leesburg, Virginia 20177 <br />Office (703) 777 -0234 Fax (703) 771 -5023 <br />Inspection Request (703) 771 -5808 <br />� R '/ <br />LMIS _ GIS Page 1 of 4 <br />JUN 12, 2 <br />Whitney M <br />WELL/WATER Permit # T80130500001 <br />Owner Name: <br />NORTHERN VA REGIONAL PARK AUTH <br />Owner Name2: <br />Drillers Report (G.W.2) Received <br />Owner Address: <br />5400 OX RD <br />Sanitarian Date <br />Well Driller Lic # <br />FAIRFAX STATION VA22039 -1022 <br />Applicant Name: <br />NORTHERN VA REGIONAL PARK AUTH <br />Applicant Name2: <br />C/O VALLEY DRILLING <br />Applicant Address: <br />9172 JOHN MOSBY HIGHWAY <br />Bacteriological Sample Received <br />UPPERVILLE, VA 20184 <br />Home Phone: <br />Work Phone: <br />Subdivision: <br />Lot: <br />Est <br />Permit Active Date: <br />Pin #: <br />Tax Map #: <br />Construction Purpose <br />Permit Purp: <br />Structure Type: <br />System Type : <br />2008 -06 -09 <br />017398983000 <br />/64/////////5/ <br />NEW CONSTRUCTION <br />WATER FW <br />STRUCTURE TYPE <br />IV <br />14 0)19.- fib$ --- V1C3 <br />Directions to property : A LOCATIONAL CLEARANCE IS REQUIRED BY B &D - Rt. 7 E to L on Cascades <br />Parkway, to L on Fairway Drive to 46666 Fairway Drive on R <br />New X Repair _ Abandonment _ Upgrade _ Hydrofrack Well ID # <br />Based on the application for a well /water supply system construction permit filed in accordance with Chapter 1040. Codified <br />Ordinances, a construction permit is issued to: NORTHERN VA REGIONAL PARK AUTH <br />DESIGN <br />Water supply, existing: (describe) <br />To be installed: class IV (g R ) &'-( <br />Cased and Grouted to Bedrock plus 10' or a minimum <br />cased 60 ' Grouted 60 ' whichever is greater <br />Well Location. See Page <br />I. If well yield as determined by 30 minute airlift test is less <br />than 5 gallons per minute, a pumping test must be performed <br />as follows: <br />A. Pump and related equipment shall be installed and the static <br />water level measured. <br />B. Pumping shall begin at a rate of withdrawal greater than 5 <br />GPM until water level drops to a point close to bottom of the <br />well. <br />C. At this point, the pump rate shall be adjusted so the water <br />level remains constant. <br />D. Measure and record the volume of water discharge and <br />water level (electric tape) at 15 minute intervals throughout <br />the test. <br />E. Discharge water at least 50 feet from the well and sewage <br />disposal area. <br />F. Interruption of pumping longer than 15 minutes shall require <br />extending the pumping time that amount of time. <br />The well /water system is to be constructed as specified by the <br />permit X and attached plans /specifications. <br />This water system construction permit is null and void if (a) <br />conditions are changed from those shown on the application <br />(b) conditions are changed from those shown on the <br />comstruction permit. <br />NOTE: INSPECTION RESULTS <br />Water supply location: Satisfactory <br />yes �o ❑ <br />Drillers Report (G.W.2) Received <br />, <br />yes �� El <br />❑ <br />Well Construction Approval yes no <br />Sanitarian Date <br />Well Driller Lic # <br />11 <br />Pump Installer Lic # <br />Chemical Quality Data Received yes ❑ <br />no ❑ N/A ❑ <br />Pumping Data Received yes ❑ <br />no ❑ N/A ❑ <br />As built sketch on page <br />Bacteriological Sample Received <br />yes ❑ no ❑ <br />Water System Approved <br />yes ❑ no ❑ <br />Sanitarian Date <br />II. Criteria for approval of well and well yield are as follows: <br />The well must produce a: <br />A. Minimum of 1 gallon per minute for 6 continuous <br />pumping hours after the well has been pumped out <br />according to Part 1, Sec. B of this permit. <br />B. The pump test can be terminated early and well yield <br />considered adequate if: <br />1. The well cannot be pumped out as stated in Part 1, <br />Sec. B of this permit. <br />2. The well yields 2.5 GPM or greater for 3 hours of <br />continuous pumping after Part 1, Sec.6 of this <br />permit are completed. <br />C. Sufficient storage and yield may be considered for <br />approval. <br />D. Person conducting the pump test shall collect a sample <br />to be analyzed for constituents described in Codified <br />Ordinances of Loudoun County Title 4, Chapter 1040, <br />Appendix III. <br />E. Replacement wells are exempt from this requirement. <br />Date: 2008-06-99 Issued By: This Construction <br />Permit Valid Until <br />Date: Reviewed By: 2009 -06 -09 <br />